Installation method: After opening the package, place the lower part of the lightning rod on the reserved installation position of the pole, and use bolt accessories to install and tighten it. You can also weld the connection as needed.
Phone:
006588662519Installation method: After opening the package, place the lower part of the lightning rod on the reserved installation position of the pole, and use bolt accessories to install and tighten it. You can also weld the connection as needed.
Installation precautions: It is necessary to ensure reliable electrical connection between the lightning rod and the down conductor; the protected range should be calculated according to the rolling ball method stipulated in the "Building Lightning Protection Design Code". The grounding system is good and its grounding resistance should be less than 10 ohms
Model |
YBT-YFD50 |
Advance discharge time |
50μs |
Length |
0.4m |
Material |
alloy material |
Weight |
3.1kg |
Installation method |
flange fixing/welding |
Working hours |
working around the clock ESE Lightning Rod |
Henan Yangbo Lightning Protection Technology Co., Ltd. was established in 2006 with a registered capital of 16 million and a self-owned factory of more than 8,600 square meters. It has a strong economic foundation and superb professional technology.